1. Onboarding Runbook (New PSAP / Emergency Call Center)
Objective: Integrate a new Public Safety Answering Point (PSAP) or regional call center into the NG911 ecosystem.
Step Sequence:
- Pre-Validation
- Provision DIA/MPLS circuits with diverse physical paths.
- Confirm ESInet/NGCS interconnection agreements.
- Inventory CAD, radio gateways, and recording systems.
- Edge Deployment
- Install SD-WAN appliances for DIA/MPLS + LTE/5G failover.
- Configure VLANs/VRFs: CAD, call handling, admin IT.
- Deploy redundant SBCs for SIP call routing.
- Zero-Touch Provisioning (ZTP)
- Devices register with orchestrator.
- Apply NG911 templates (QoS for voice, geo-pin for calls).
- Security & Compliance Enrollment
- PKI/ZTNA roles: call-taker, dispatcher, supervisor.
- Enable SIEM logging for all call routing.
- Tag logs for CJIS compliance.
- Functional Tests
- Place test 911 calls (wired, mobile, VoIP).
- Validate CAD integration with AVL/GPS.
- Confirm recordings geo-replicated.
- Handover
- PSAP marked “Production” in CMDB.
- NOC/SOC monitoring thresholds enabled (call success rate, CAD uptime).
2. Failover Runbook (Primary Call Path Loss)
Objective: Ensure call-taking and dispatch continuity during carrier or trunk outage.
Step Sequence:
- Detection
- AIOps flags call setup failures >1%.
- Synthetic 911 call probe fails.
- Automatic Failover
- SD-WAN/SBC reroutes calls to alternate ESInet path.
- LTE/5G backup ensures dispatch CAD connectivity.
- Non-emergency admin traffic throttled.
- Validation
- Place test 911 call via alternate carrier.
- Confirm CAD sync continues via failover path.
- Notification
- NOC escalates to telecom carrier.
- Supervisor briefed.
- Recovery
- Primary path restored.
- Failback executed without call drop.
- SLA incident logged.
3. Incident Response Runbook (Fraudulent or Malicious Call Flood / DDoS)
Objective: Contain denial-of-service or spoofed call attempts threatening PSAP operations.
Step Sequence:
- Alert
- SIEM detects unusual call volume patterns.
- SBC flags high SIP INVITE rates from untrusted sources.
- Containment
- Activate SIP flood protection rules.
- Block untrusted ranges via SBC/Firewall.
- Shift overflow calls to mutual-aid PSAPs.
- Eradication
- SOC validates clean call flow.
- Update SBC rules/signatures.
- Recovery
- Resume normal load distribution.
- Validate PSAP throughput with synthetic test calls.
- Postmortem
- Incident filed with regulators.
- Playbook updated for DDoS response.
4. Disaster Recovery Drill Runbook (PSAP Facility Loss)
Objective: Rehearse full loss of an emergency call center due to disaster (fire, storm, flood).
Step Sequence:
- Scenario Trigger
- Simulate PSAP facility outage.
- Failover Activation
- Calls rerouted automatically to designated backup PSAP (per NENA i3).
- Dispatch transferred to alternate site with CAD mirroring.
- Field units routed to alternate PSAP radio channels.
- Critical Validation
- Test 911 call answered at backup PSAP.
- Confirm CAD incident created and dispatched.
- Validate recordings remain compliant.
- Time-to-Recover Measurement
- RTO measured from trigger to backup call answer.
- RPO measured for CAD/AVL data (<5 min).
- Debrief
- Supervisors, compliance, and IT review findings.
- Adjust DR posture (e.g., add LTE failover kits, diversify carriers).
Roles & Responsibilities
- NOC: Monitor circuits, SIP trunks, failover health.
- SOC: Detect SIP floods, spoofed calls, and anomalous access.
- Dispatch Supervisors: Validate call flows, CAD continuity.
- Compliance Officers: Ensure CJIS/NENA reporting.
- Carriers: Restore trunk circuits, SIP services.
KPIs (Public Safety Runbook Metrics)
- Onboarding: PSAP live <30 days, compliance signed off.
- Failover: Call continuity ≥99.999%, failover <30 sec.
- Incident Response (SIP flood): Containment <15 min.
- DR Drill: RTO ≤2 hours, RPO ≤5 min for CAD data.
- Compliance: CJIS/NENA/FCC audit pass = 100%.
⚖️ Logos Framing
- Onboarding = writing a new PSAP “letter” into the grammar of public safety.
- Failover = synonym substitution (alternate trunks, PSAPs) to keep sentences of emergency calls coherent.
- Incident Response = correcting corrupted “words” (spoofed/flooded calls).
- DR Drills = recursive rehearsal ensuring the language of trust survives even under chaos.