1. Onboarding Runbook (New Vessel or Rig Integration)
Objective: Bring a new ship or offshore platform into the SolveForce maritime fabric, ensuring secure crew networks and protected OT systems.
Step Sequence:
- Pre-Validation
- Confirm VSAT service contract (LEO/MEO/GEO constellation).
- Provision LTE/5G for near-shore ops and microwave at ports.
- Inventory OT systems (engine control, SCADA, DP systems).
- Edge Deployment
- Install SD-WAN edge with dual VSAT modems (redundant).
- Configure VLANs/VRFs: OT safety systems, corporate IT, crew welfare Wi-Fi.
- Deploy edge compute node for OT telemetry buffering.
- Zero-Touch Provisioning (ZTP)
- SD-WAN device registers to controller over VSAT bootstrap.
- Apply maritime profile (QoS prioritization for OT over crew internet).
- Security & Compliance Enrollment
- Certificates provisioned (PKI/HSM).
- ZTNA roles: captain, officers, engineers, crew.
- Logs directed to SIEM tagged under IMO compliance scope.
- Functional Tests
- Validate engine SCADA telemetry loop.
- Test SATCOM voice call to HQ.
- Validate crew Wi-Fi segregated from OT.
- Handover
- Vessel registered in CMDB.
- NOC/SOC thresholds active (latency, jitter, link availability).
2. Failover Runbook (VSAT or Satellite Path Loss)
Objective: Maintain connectivity during satellite failure or link degradation.
Step Sequence:
- Detection
- AIOps detects packet loss >3% or jitter >150 ms on VSAT.
- Crew reports call/video issues.
- Automatic Failover
- SD-WAN reroutes OT traffic to backup VSAT modem (different satellite beam).
- Near-shore → LTE/5G automatically prioritized.
- Port arrival → microwave backhaul engaged.
- Validation
- Synthetic test: SCADA telemetry verified via backup link.
- Crew VoIP call measured for MOS >3.8.
- Notification
- NOC escalates to SATCOM provider.
- Captain and IT officer notified.
- Recovery
- Primary beam restored; traffic rebalanced.
- SLA incident documented.
3. Incident Response Runbook (Crew Wi-Fi Malware → OT Attempt)
Objective: Contain potential cyber threat crossing from crew Wi-Fi into OT systems.
Step Sequence:
- Alert
- SIEM detects lateral movement attempt from crew VLAN to OT VRF.
- FWaaS flags suspicious port scanning.
- Containment
- SD-WAN policy blocks crew VLAN from OT entirely.
- Isolate infected crew device.
- ZTNA session revoked.
- Eradication
- Malware cleaned or device quarantined until port arrival.
- Crew network re-imaged/reset if required.
- Recovery
- OT network verified clean (no anomalies).
- Crew Wi-Fi restored with stricter segmentation.
- Postmortem
- SOC report filed under IMO/ISM cyber guidelines.
- Security rules updated for future voyages.
4. Disaster Recovery Drill Runbook (Rig/Ship Offline Scenario)
Objective: Rehearse full loss of communications and validate DR posture.
Step Sequence:
- Scenario Trigger
- Simulate VSAT antenna failure or catastrophic power loss.
- Failover Activation
- Switch to backup satellite beam or alternate constellation (LEO/MEO).
- Fallback to HF radio/GMDSS for safety comms if all satellite lost.
- Crew emergency procedures activated.
- Critical Validation
- Test distress call to MRCC (Maritime Rescue Coordination Center).
- Validate engine telemetry buffered locally for replay once link restored.
- Time-to-Recover Measurement
- Measure failover timing (<60 sec for dual VSAT).
- GMDSS call validated within regulatory limits.
- Debrief
- Findings reported to vessel operators and compliance officers.
- Adjust redundancy (e.g., add LEO constellation subscription).
Roles & Responsibilities
- NOC: Monitor VSAT, LTE, microwave performance.
- SOC: Detect crew-to-OT breach attempts, enforce ZTNA.
- Ship IT Officer: Validate connectivity, isolate compromised devices.
- Captain/Bridge Crew: Approve emergency DR activation.
- Vendors/Providers: SATCOM/ISP carrier restoration.
KPIs (Maritime Runbook Metrics)
- Onboarding: Vessel online <14 days with SATCOM + LTE/5G + microwave tested.
- Failover: VSAT beam switch <60 sec; MOS ≥3.8 maintained.
- Breach Containment: <1 hour.
- DR Drill: GMDSS success = 100%, RTO ≤1 hour for SATCOM restore.
- Compliance: IMO/ISM audit pass = 100%.
⚖️ Logos Framing
- Onboarding = writing the vessel’s “name” into the maritime grammar.
- Failover = synonym substitution across satellite, LTE, microwave.
- Incident Response = correcting corrupted crew “letters” before they reach the OT script.
- DR Drills = recursive rehearsal — proving that maritime communication language endures under duress.